Image from Google Jackets
Image from OpenLibrary

Sasa River Basin Feasibility Study Volume three:Annex B: Agricultural development Concepts:Annex C: Project management and organisation

Material type: TextPublication details: Ibadan ORBDA 1982Description: 120pg PbkSubject(s): LOC classification:
  • 9S494.5.S2.A5.031982
Tags from this library: No tags from this library for this title. Log in to add tags.
Star ratings
    Average rating: 0.0 (0 votes)
Holdings
Item type Current library Call number Status Barcode
Books Main LIbrary 9S494.5.S2.A5.031982 (Browse shelf(Opens below)) Available 2025-220922

There are no comments on this title.

to post a comment.