Faster construction projects with CPM scheduling/
Material type:
TextPublication details: New york Mc Graw- Hill 2007Description: xiii,412p hbkISBN: - 0071486607
- TH 438.4. W6 2007
| Item type | Current library | Call number | Status | Barcode | |
|---|---|---|---|---|---|
Books
|
Main LIbrary | TH 438.4. W6 2007 (Browse shelf(Opens below)) | Available | 2025-224937 |
Browsing Main LIbrary shelves Close shelf browser (Hides shelf browser)
|
|
|
|
|
|
|
No cover image available No cover image available | ||
| TH 438.P38 1977 Information methods; Design and construction | TH 438.P38 1977 Information methods; Design and construction | TH438.S43 2008 Construction project management : a practical guide to field construction management / | TH 438.4. W6 2007 Faster construction projects with CPM scheduling/ | TH441.D68 2006 Understanding building failures / | TH 443.H5 2005 PRINCIPLES OF CONSTRUTION SAFETY | TH 562.H87 1979 PRACTICAL PROBLEMS IN MATHEMATICS FOR CARPENTERS |
There are no comments on this title.
Log in to your account to post a comment.